|

|
PUBLIC & PRIVATE ROADS & HIGHWAYS -
|
|
Design depth requirements for stabilisation with Stabilig are often only 50% to 75% of the required design for lime, cement, slag, or flyash, or combinations of these.
|


|
-
For asphalt pavements, best bond results are achieved by applying a coat of hot bitumen (before the asphalt) to the pavement base stabilised with Stabilig.
Please refer to: "Features of Stabilig" and "Application to Soil"
|
|